The prior day the plan was to replace it while the Red Sox played, that was the only time I could do it. Driving to my fourth home improvement center I got an idea that might fix the problem on the cheap. At this time the Sox where winning so I went with my simple plan.
A little past five today, I heard my plan didn’t work. While I was hearing the bucket fill with shower water, I was estimating the time it would take to replace the shower stall. I would not have time after the day job because I would need to go to the second job. I could not let it go another day so I called in a personal day, turns out it was my first this year.
While I was working on the shower, the light flickered a bit, I figured one of the two bulbs was about to go but it flickered too much. I removed the globe and saw that there was only one bulb and the problem is a partially bare wire. I sighed a sigh but I’m glad I caught it.
I removed the old shower stall and stood where it used to be, well I tried to stand where it used to be. The previous installer used particle board for the flooring which is the worst type of wood product one can use for a bathroom floor. My foot went through the floor and stopped on the ceiling below.
Everything is back in working order. I’m fighting the start of a cold again and wearing a t-shirt of my own design and making because I’m short on clean clothes.

Dragons down the spine. There is supposed to be a dragon on the left breast too but I haven't done that yet, not on this t-shirt. The Dragons are my sister's school sports team(s). I was bored . Red isn't my color. My sister is a high school teacher.
No comments:
Post a Comment